Wednesday, 27 February 2013
Alternative Sources
Change of plan. The chance of me actually getting inside the building again is so slim that I have had to look elsewhere for the information I need. Luckily, one of my course mates was able to tell me that the walls are load bearing brick with steel columns inside. Which is what was initially thought anyway. I am now going to get to work on the sections I sketched out and mark out where the loadings are and the current plan of the walls etc. I also need to draw up a scaled section to start thinking about my design within a measured environment - or as measured as I can get anyway. Once I can see what walls I can afford to remove without the whole building collapsing, I really will be able to start getting some solid designs down on paper. Hopefully. Feeling a little better but will feel even better when I get drawing again!
Labels:
construction,
design,
measurements,
sections
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment